Summary

• Downflow air conditioning via an integrated raised floor plenum system
• Plasterboard ceilings with suspended Trilux LED lumieres
• Fully accessible raised floors – typically 350mm void
• Finished floor to ceiling height – typically c. 3m
• Design criteria – 1 person / 8 sq. m.
• Two 13 person passenger lifts
• 90 secure bicycle spaces
• Separate male and female changing facilities, with 9 showers, 94 lockers and a drying room
• 4 car parking spaces on Charterhouse Square
• BREEAM rating of “Excellent”
• Provisional EPC rating of B (33)
• Cold Wired Score rating

Detail

DIMENSIONS
Finished raised floor to plaster ceiling height: Typically c. 3m

Raised floor levels 1-5: Typically c. 350mm floor void with 50mm floor tile above

Raised floor level 6: Typically c. 500mm floor void with 50mm floor tile above

FINISHES
RECEPTION
High quality finishes throughout, including a polished concrete floor and a feature wall constructed of black lacquered steel fins on hot rolled mild steel sections with a painted white plasterboard finish behind, incorporating a red tenant’s directory. Furnishings include a bespoke monolithic corian reception desk and wooden furniture.

OFFICE AREAS
Floors: The office raised floor is a fully accessible steel encapsulated 600 x 600 panel system.
Ceilings: The office ceilings, columns and beams are drylined, skimmed and painted white.
Walls: The office walls are finished in white painted plasterboard with grey painted plasterboard to partial areas of the core exterior.
Joinery: The office doors are generally 2.25m lacquered solid core doors with high quality oak pull handles.

RETAIL AREAS
The retail units have been delivered as shell and core spaces with single glazed shop front facades and integrated access doors. They have allocated roof plant space for retail kitchen extract fans and VRF condensers.

WCs
High quality pre-cast concrete tiling to WC floors, built in vanity units with corian tops, ceramic wash basins with wall mounted mixer taps, white wall mounted WCs with matt chrome flushplates, feature alcoves with natural oak veneer linings, ceramic tiled back faces and stainless steel trims.

BASEMENT
Ceramic tiling is applied to walls and floors of the changing areas and shower cubicles.  There is a feature alcove in each shower.  The changing rooms contain Z format modular stacked lockers, oak benches and recessed TVs. The drying room contains modular stacked cage lockers.

LIFTS
Lift floors are of high quality pre-cast concrete tiles. The lift walls are aluminium with mirrors and oak handrails and the interior doors are finished in stainless steel.  On the ground floor, the lift exterior is finished in black and on all other floors in stainless steel. The lift reveals will be black on all floors.

WC PROVISION
On floors 1-5, the core provides 6 designated WCs per floor, with 4 designated WCs on floor 6. In addition, a fully accessible WC for the disabled is located on every floor, including the Ground floor. WC provision on every floor is based on occupancy of 1 person per 8 sq m for standard office areas with a 60/60 male female split and an 80% utilisation factor.

CYCLE STORAGE / LOCKERS / SHOWERS
There are 90 secure bicycle spaces and 94 lockers. Separate male and female changing facilities are provided. Each has 4 individual shower cubicles and a communal changing area. Two designated WCs and an accessible WC/shower are provided on the basement level. In total there will be 9 showers.

LIFT PROVISION
Two 13 person passenger lifts are installed in line with BCO 2014 specification. One 13 person lift will be used as a passenger / fire fighting lift, the other lift will be used as a passenger / goods lift.

MEANS OF ESCAPE
Means of escape throughout the building are sized to 1 person / 6 sq m.

MECHANICAL SERVICES
The mechanical services are designed to meet the following criteria:

Outside temperature:
Winter: -4°C (Saturated)
Summer: 29°C db / 20°C wb

Internal temperature:
Offices summer: 24°C ± 2°C during occupied hours
Offices winter: 20°C ± 2°C during occupied hours
Reception summer: 24°C ± 2°C during occupied hours
Reception winter: 20°C ± 2°C WCs: 18°C minimum temperature. No cooling
Stairwells: Heated only to 18°C dB min

Occupancy Criteria: The ventilation, cooling and heating systems for normal office usage are based on occupancy of 1 person per 8 sq m.

Ventilation Rates

Offices: 12 litres / sec / per person minimum

WCs / showers: 10 air changes / hour extract, 8 air changes / hour supply

Heating: Initial heating of the incoming fresh air will be via low Nitrous Oxide low temperature boilers located within the basement.

Low temperature hot water will be distributed via a set of primary pumps to the secondary circuits. The hot water will then be distributed via pipework to serve the air handling units (AHUs). Direct expansion (DX) split systems will provide secondary heating to the AHUs and the down flow units.

Cooling: The cooling source will be via DX split systems. The DX pipework will be distributed to serve the AHUs and down flow units.

ELECTRICAL SERVICES
Standby Generation: A dedicated standby power generator and switchgear is provided to support the life safety services within the building.

Tenant Plant / Services: Space has been identified at roof level for future Tenant’s plant and in the risers For office tenants use, for retail kitchen extracts & VRF pipework.

Lighting: The lighting design is within the spirit of the CIBSE Guide LG7, to provide an average office level of 500 lux based on an open plan arrangement with 0.4 uniformity.

BMS
All plant controls are DDC (direct digital control) thus enabling accurate control and modification to be made with respect temperature, pressure, time schedules etc and facilitate alarm notifications. The BMS is based on an open protocol system to allow future adaptation.

TELECOMMUNICATIONS / CONNECTIVITY
Multiple incoming communications ducts come into two diverse intake rooms catering for services from a number of communications providers including Hyperoptic broadband. The demised offices have a communication riser within the tenant’s area and containment routes from the BT intake room in the basement.

Wired Score Rating: Gold Under Telecommunications

HIGH DENSITY OCCUPIERS
The building’s inclusive design provides for tenants to occupy the building efficiently and intensively. Means of escape throughout the building are sized to 1 person / 6 sq m. Provision for air conditioning and WCs are at 1 person / 8 sq m on all office floors.

SUSTAINABILITY
A BREEAM rating of “Excellent”

Provisional EPC
B (33)

Wired Score
Gold

FLOOR LOADINGS
Office floors: 3kN/sq m (4.0kN/sq m concentrated)